Skip to content
Fayette Tribune
Marketplace Search
    • Marketplace
    • Log in
    • Favorite Listings
    • Saved Searches
    • My Ads
    • Account Settings
    • Log in
    • Place Ad
  • Log in
  • Sign In;}
    • Favorite Listings
    • Saved Searches
    • My Ads
    • Account Settings
    • Log in
  • Place Ad
  • Public Notices
Back
Featured

State Of West Virginia Departm...

Share

    Share Ad

  • Facebook
  • Twitter
  • reddit
  • WhatsApp
Print
State Of West Virginia
Department of
Environmental Protection
Division of Water and Waste Management

PUBLIC NOTICE

WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION'S, PUBLIC INFORMATION OFFICE, 601 57TH STREET SE, CHARLESTON, WEST VIRGINIA 25304-2345 TELEPHONE: (304) 926-0440.

APPLICATION FOR COVERAGE UNDER THE GENERAL WEST VIRGINIA NATIONAL
POLLUTANT DISCHARGE
ELIMINATION SYSTEM WATER
POLLUTION CONTROL
PERMIT NO. WV0115924

Public Notice No.: LMD-084-2026

Public Notice Date:
June 04, 2026

Paper: The Fayette Tribune

The following has applied for coverage under the General WV/ NPDES Water Pollution Control Permit No. WV0115924 for this facility or activity:

Appl. No.: WVR112127

Applicant:
THE CHURCH UNITED IN WEST VIRGINIA, INC
296 CROSSROAD DRIVE
MOUNT HOPE, WV 25880

Location:
MOUNT HOPE,
RALEIGH COUNTY

Latitude: 37:51:01
Longitude: 81:11:16

Receiving Stream:
North Sand Br / Sand B / Paint Ck / Kanawha R

Activity:
11.02 acres of earth disturbance to perform excavation, grading, utility installation and building construction for 12 small cabins and an event center. This project is being sent to public notice due to the length of disturbed earth till final stabilization.

Business conducted:
Discharge of treated stormwater into Sand Branch, a tributary of Paint Creek, a tributary of the Upper Kanawha River.

Implementation:
N/A

On the basis of review of the application, the "Water Pollution Control Act (Chapter 22, Article 11-8(a))," and the "West Virginia Legislative Rules," the State of West Virginia will act on the above application.

Any interested person may submit written comments on the site registration permit application and may request a public hearing by addressing such to the Director of the Division of Water and Waste Management within 30 days of the date of the public notice. Such comments or requests should be emailed to Billy.t.Shirley@wv.gov or addressed to:

Director, Division of Water and Waste Management, DEP
ATTN: Billy Shirley,
Permitting Section
601 57th Street SE
Charleston, WV 25304-2345

The public comment period begins June 04, 2026 and ends July 04, 2026.

Comments received within this period will be considered prior to acting on the permit application. Correspondence should include the name, address and the telephone number of the writer and a concise statement of the nature of the issues raised. The Director shall hold a public hearing whenever a finding is made, on the basis of requests, that there is a significant degree of public interest on issues relevant to the site registration permit application and this facility's coverage under the General Permit. Interested persons may contact the Public Information Office to obtain further information.

The application may be inspected, by appointment, at the Division of Water and Waste Management Public Information Office, at 601 57th Street, Charleston, WV, between 8:00 a.m. and 4:00 p.m. on business days. Copies of the application and the General Permit and Fact Sheet may be obtained from the Division at a nominal cost.
Posted 5 weeks ago

Explore more

Featured

Tariff Form No. 12 (Tariff Rul...

Tariff Form No. 12 (Tariff Rul...

Tariff Form No. 12
(Tariff Rule 23. l et seq.)

PUBLIC NOTICE OF CHANGE IN RATES BY NON-LRR MUNI UTILITY

NOTICE is hereby given that Town of Pax public utlity, has adopted by ordinance on July 18th, 2024 a tariff containing increased rates, tolls and charges for furnishing water service to 315 customers at Pax Water Company in the County(ies) of Fayette, West Virginia.

The proposed increased rates and charges will become effective July 19th, 2024 unless otherwise ordered by the Public Service Commission and will produce approximately $13,200 annually in additional revenue, an increase of .03%. The average monthly bill for the various classes of customers will be changed as follows:

($) INCREASE INCREASE(%)

Residential $1.02 .03%
Commercial $1.02 .03%

Resale customers of Beckley Water Company include Town of Pax.

The increases shown are based on averages of all customers in the indicated class. Individual customers may receive increases that are greater or less than average. Furthermore, the requested rates and charges are only a proposal and are subject to change (increases or decreases) by the Public Service Commission in its review of this filing. The Commission shall review and approve or modify the increased rates only upon the filing of a petition within thirty (30) days of the adoption of the ordinance changing said rates or charges by:

(1) Any customer aggrieved by the changed rates or charges who presents to the Commission a petition signed by not less than twenty-five percent of the customers served by such municipally operated public utility; or

(2) Any customer who is served by a municipally operated natural gas public utility and who resides outside the corporate limits and who is affected by the change in said rates or charges and who presents to the Commission a petition alleging discrimination between customers within and without the municipal boundaries. Said petition shall be accompanied by evidence of discrimination; or

(3) Any customer or group of customers of a municipally operated natural gas utility who are affected by said change in rates who reside within the municipal boundaries and who present a petition to the Commission alleging discrimination between said customer or group of customers and other customers of the municipal utility. Said petition shall be accompanied by evidence of discrimination.

All petitions should be addressed to the Executive Secretary, Public Service Commission of West Virginia, 201 Brooks Street, P.O. Box 812, Charleston, West Virginia 25323.

A complete copy of the proposed rates, as well as a representative of the utility to provide any information requested concerning it, is available to all customers, prospective customers, or their agents at any of the following
offices of the utility.

A copy of the proposed rates is available for public inspection at the office of the Execut Executive Secretary of the Public Service Commission at 201 Brooks Street, P.O. Box 812, Charleston, West Virginia 25323.

Tariff Form No. 12
(Tariff Rule 23. l et seq.)

PUBLIC NOTICE OF CHANGE IN RATES BY NON-LRR MUNI UTILITY

NOTICE is hereby given that Town of Pax public utlity, has adopted by ordinance on July 18th, 2024 a tariff containing increased rates, tolls and charges for furnishing water service to 315 customers at Pax Water Company in the County(ies) of Fayette, West Virginia.

The proposed increased rates and charges will become effective July 19th, 2024 unless otherwise ordered by the Public Service Commission and will produce approximately $13,200 annually in additional revenue, an increase of .03%. The average monthly bill for the various classes of customers will be changed as follows:

($) INCREASE INCREASE(%)

Residential $1.02 .03%
Commercial $1.02 .03%

Resale customers of Beckley Water Company include Town of Pax.

The increases shown are based on averages of all customers in the indicated class. Individual customers may receive increases that are greater or less than average. Furthermore, the requested rates and charges are only a proposal and are subject to change (increases or decreases) by the Public Service Commission in its review of this filing. The Commission shall review and approve or modify the increased rates only upon the filing of a petition within thirty (30) days of the adoption of the ordinance changing said rates or charges by:

(1) Any customer aggrieved by the changed rates or charges who presents to the Commission a petition signed by not less than twenty-five percent of the customers served by such municipally operated public utility; or

(2) Any customer who is served by a municipally operated natural gas public utility and who resides outside the corporate limits and who is affected by the change in said rates or charges and who presents to the Commission a petition alleging discrimination between customers within and without the municipal boundaries. Said petition shall be accompanied by evidence of discrimination; or

(3) Any customer or group of customers of a municipally operated natural gas utility who are affected by said change in rates who reside within the municipal boundaries and who present a petition to the Commission alleging discrimination between said customer or group of customers and other customers of the municipal utility. Said petition shall be accompanied by evidence of discrimination.

All petitions should be addressed to the Executive Secretary, Public Service Commission of West Virginia, 201 Brooks Street, P.O. Box 812, Charleston, West Virginia 25323.

A complete copy of the proposed rates, as well as a representative of the utility to provide any information requested concerning it, is available to all customers, prospective customers, or their agents at any of the following
offices of the utility.

A copy of the proposed rates is available for public inspection at the office of the Execut Executive Secretary of the Public Service Commission at 201 Brooks Street, P.O. Box 812, Charleston, West Virginia 25323.

Posted 101 weeks ago
Featured

PUBLIC SERVICE COMMISSION OF W...

PUBLIC SERVICE COMMISSION OF W...

PUBLIC SERVICE COMMISSION
OF WEST VIRGINIA
CHARLESTON

CASE NO. 24-0415-E-P

APPALACHIAN POWER COMPANY and WHEELING POWER COMPANY
Petition for Review of Vegetation Management Program and Update of VMP Surcharge.

NOTICE OF FILING AND HEARINGS

Notice is hereby given that Appalachian Power Company and Wheeling Power Company (the Companies), public utilities, have, on April 30, 2024, filed with the Public Service Commission of West Virginia a Petition to update their Vegetation Management Program (VMP) rates as required by previous Commission Orders. If approved, the increased rates will apply to electric service to approximately 462,328 customers in the counties of Boone, Brooke, Cabell, Clay, Fayette, Greenbrier, Jackson, Kanawha, Lincoln, Logan, Marshall, Mason, McDowell, Mercer, Mingo, Monroe, Nicholas, Ohio, Putnam, Raleigh, Roane, Summers, Wayne, Wetzel, and Wyoming.

The Companies propose to increase VMP rates by approximately $1.2 million, an increase of 0.07% annually, effective for a period of two years. If approved, the average monthly bill for the various classes of customers will be changed as follows:


1 Excludes Special Contract customers who are billed standard tariff rates.

The increases shown are based on 1,000 Kwh monthly usage for residential customers and the monthly average usage of all customers in the other classes. Individual customers may receive an increase that is greater or less than average. Furthermore, the requested rates are only a proposal and are subject to change.

If the rate including the fixed monthly charge plus a kWh rate is approved, the residential monthly bill at various usage levels would be changed as follows:


The Public Service Commission will conduct a public comment hearing in this matter on September 30, 2024, beginning at 5:00 p.m. The public comment hearing will be held virtually, allowing for interested persons to make a comment telephonically, through the Microsoft Teams application from the internet, or in-person at the Commission headquarters. Interested persons intending to make a virtual public comment should register with the Commission by 4:00 p.m. on Thursday, September 26, 2024. Registration may be made by any of the following methods:

(1) Through the Microsoft Teams meeting link located on the Commission's website, http://www.psc.state.wv.us under the "PSC Hot Topics" section located at the top of the homepage;
(2) By calling 304-340-0836 (Karen Hall) or 304-340-0820 (Andrew Gallagher); or
(3) By emailing khall@psc.state.wv.us or agallagher@psc.state.wv.us.

The link for the Microsoft Teams meeting will also be in a future press release from the Commission. Interested persons wishing to comment in-person at the public comment hearing should attend and sign up to speak at 5:00 p.m. at the Public Service Commission, Howard M. Cunningham Hearing Room, 201 Brooks Street, Charleston, West Virginia.

As an alternative to speaking at the public comment hearing virtually or in person, individuals or entities interested in providing written comments regarding this case should submit their comments by mail or hand delivery to Executive Secretary, P. O. Box 812, Charleston, West Virginia 25323 or online at http://www.psc.state.wv.us by clicking on "Submit A Comment" in the left column and following the directions provided. All written comments should be marked with Case No. 24-0415-E-P.

The Commission will conduct an evidentiary hearing at 9:30 a.m. on October 1, 2024, in the Howard M. Cunningham Hearing Room, Public Service Commission Building, 201 Brooks Street, Charleston, West Virginia. Interested persons should monitor the Commission's web docket and website because the public comment or evidentiary hearing may be cancelled for good cause.

Anyone desiring to intervene should file a written petition to intervene by August 1, 2024. Failure to intervene timely can affect your right to participate in the proceeding. Requests to intervene must comply with the Commission's rules on intervention. Petitions to intervene should be addressed to: The Executive Secretary, Public Service Commission of West Virginia, P.O. Box 812, Charleston, West Virginia 25323.

APPALACHIAN POWER COMPANY and
WHEELING POWER COMPANY

PUBLIC SERVICE COMMISSION
OF WEST VIRGINIA
CHARLESTON

CASE NO. 24-0415-E-P

APPALACHIAN POWER COMPANY and WHEELING POWER COMPANY
Petition for Review of Vegetation Management Program and Update of VMP Surcharge.

NOTICE OF FILING AND HEARINGS

Notice is hereby given that Appalachian Power Company and Wheeling Power Company (the Companies), public utilities, have, on April 30, 2024, filed with the Public Service Commission of West Virginia a Petition to update their Vegetation Management Program (VMP) rates as required by previous Commission Orders. If approved, the increased rates will apply to electric service to approximately 462,328 customers in the counties of Boone, Brooke, Cabell, Clay, Fayette, Greenbrier, Jackson, Kanawha, Lincoln, Logan, Marshall, Mason, McDowell, Mercer, Mingo, Monroe, Nicholas, Ohio, Putnam, Raleigh, Roane, Summers, Wayne, Wetzel, and Wyoming.

The Companies propose to increase VMP rates by approximately $1.2 million, an increase of 0.07% annually, effective for a period of two years. If approved, the average monthly bill for the various classes of customers will be changed as follows:


1 Excludes Special Contract customers who are billed standard tariff rates.

The increases shown are based on 1,000 Kwh monthly usage for residential customers and the monthly average usage of all customers in the other classes. Individual customers may receive an increase that is greater or less than average. Furthermore, the requested rates are only a proposal and are subject to change.

If the rate including the fixed monthly charge plus a kWh rate is approved, the residential monthly bill at various usage levels would be changed as follows:


The Public Service Commission will conduct a public comment hearing in this matter on September 30, 2024, beginning at 5:00 p.m. The public comment hearing will be held virtually, allowing for interested persons to make a comment telephonically, through the Microsoft Teams application from the internet, or in-person at the Commission headquarters. Interested persons intending to make a virtual public comment should register with the Commission by 4:00 p.m. on Thursday, September 26, 2024. Registration may be made by any of the following methods:

(1) Through the Microsoft Teams meeting link located on the Commission's website, http://www.psc.state.wv.us under the "PSC Hot Topics" section located at the top of the homepage;
(2) By calling 304-340-0836 (Karen Hall) or 304-340-0820 (Andrew Gallagher); or
(3) By emailing khall@psc.state.wv.us or agallagher@psc.state.wv.us.

The link for the Microsoft Teams meeting will also be in a future press release from the Commission. Interested persons wishing to comment in-person at the public comment hearing should attend and sign up to speak at 5:00 p.m. at the Public Service Commission, Howard M. Cunningham Hearing Room, 201 Brooks Street, Charleston, West Virginia.

As an alternative to speaking at the public comment hearing virtually or in person, individuals or entities interested in providing written comments regarding this case should submit their comments by mail or hand delivery to Executive Secretary, P. O. Box 812, Charleston, West Virginia 25323 or online at http://www.psc.state.wv.us by clicking on "Submit A Comment" in the left column and following the directions provided. All written comments should be marked with Case No. 24-0415-E-P.

The Commission will conduct an evidentiary hearing at 9:30 a.m. on October 1, 2024, in the Howard M. Cunningham Hearing Room, Public Service Commission Building, 201 Brooks Street, Charleston, West Virginia. Interested persons should monitor the Commission's web docket and website because the public comment or evidentiary hearing may be cancelled for good cause.

Anyone desiring to intervene should file a written petition to intervene by August 1, 2024. Failure to intervene timely can affect your right to participate in the proceeding. Requests to intervene must comply with the Commission's rules on intervention. Petitions to intervene should be addressed to: The Executive Secretary, Public Service Commission of West Virginia, P.O. Box 812, Charleston, West Virginia 25323.

APPALACHIAN POWER COMPANY and
WHEELING POWER COMPANY

Posted 100 weeks ago
Featured

PUBLIC SERVICE COMMISSION OF W...

PUBLIC SERVICE COMMISSION OF W...

PUBLIC SERVICE COMMISSION
OF WEST VIRGINIA
CHARLESTON

CASE NO. 24-0496-G-390P

HOPE GAS, INC.
Annual Pipeline Replacement and Expansion Program and Application to Implement Modification to Existing PREP Gathering Program

NOTICE OF FILING AND HEARING

On May 31, 2024, Hope Gas, Inc. (Hope) filed its Annual Pipeline Replacement and Expansion Program (PREP) Filing with revised PREP Rates, pursuant to W. Va. Code sect. 24-2-1k, which authorizes the Public Service Commission of West Virginia (Commission) to approve cost recovery of projects to replace, upgrade, and expand natural gas utility infrastructure that are deemed to be just and reasonable and in the public interest.

Additionally, pursuant to Commission Order in Case No. 23-0317-G-PC, Hope shall assess and collect a surcharge rate increment (Legacy Surcharge) on each customer that becomes a customer of Hope through Hope's acquisition of additional gas utilities (or their assets) and merged into Hope on and after January 1, 2023. The Legacy Surcharge shall be a rate equal to Hope's PREP rate for the customer's appropriate class.

In its base case PREP Filing, Hope projects PREP capital investment for calendar year 2025 of $65.5 million as part of its General Program (core distribution system) and Gathering Program (gathering facilities) under multi-year plans. The PREP Filing also contains a true-up for actual versus projected 2023 calendar year PREP capital investment activity for both the General Program and the Gathering Program. The PREP covers several categories of plant asset replacements and improvements, including mains, service lines, regulator stations and other plant equipment. These plant investments are proposed to be made in Hope service territories throughout the State. These projects are identified in the PREP Filing, which is on file and available for public inspection at the Commission's offices at 201 Brooks Street, Charleston, West Virginia.

In this annual PREP filing, Hope is also reconciling actual costs under Southern Public Service Company's (Southern) Infrastructure Replacement and Expansion Program as directed by the Commission in a prior order approving Hope's acquisition and merger of Southern into Hope.

Hope proposes to recover costs associated with these investments through an increment within the fixed or volumetric, base rate component of its rates depending on the applicable rate schedule under which service is rendered, to be effective on November 1, 2024. Hope projects that if the program and rate increments are approved as requested, the average monthly bill for the various classes of customers will be changed on November 1, 2024, as follows.









The increases shown are based on averages of all customers in the indicated classes. Each class may receive an increase greater or less than stated here. Individual customers may receive increases that are greater or less than average. Furthermore, the requested rates and charges are only a proposal and are subject to change (increase or decrease) by the Commission in its review of this filing. Any increase in rates and charges will not become effective until authorized and approved by the Commission.

The Commission adopted the following procedural schedule:


If the Commission receives no opposition to the PREP Filing within one week of the hearing date, the hearing may be waived, and the Commission may issue a final Order within 150 days of the filing date.

Anyone desiring to intervene should file a written petition to intervene within twenty (20) days following the date of this publication unless otherwise modified by Commission Order. All requests to intervene should briefly state the reason for the request to intervene and comply with the rules on intervention set forth in the Commission's Rules of Practice and Procedure. The Commission will receive public comments until the beginning of the hearing. All written comments and requests to intervene should state the case name and number and be addressed to Karen Buckley, Executive Secretary, P.O. Box 812, Charleston, West Virginia 25323. Public Comments may also be filed online at http://www.psc.state.wv.us/scripts/online comments/default.cfm by clicking the "Formal Case" link.

HOPE GAS, INC.

PUBLIC SERVICE COMMISSION
OF WEST VIRGINIA
CHARLESTON

CASE NO. 24-0496-G-390P

HOPE GAS, INC.
Annual Pipeline Replacement and Expansion Program and Application to Implement Modification to Existing PREP Gathering Program

NOTICE OF FILING AND HEARING

On May 31, 2024, Hope Gas, Inc. (Hope) filed its Annual Pipeline Replacement and Expansion Program (PREP) Filing with revised PREP Rates, pursuant to W. Va. Code sect. 24-2-1k, which authorizes the Public Service Commission of West Virginia (Commission) to approve cost recovery of projects to replace, upgrade, and expand natural gas utility infrastructure that are deemed to be just and reasonable and in the public interest.

Additionally, pursuant to Commission Order in Case No. 23-0317-G-PC, Hope shall assess and collect a surcharge rate increment (Legacy Surcharge) on each customer that becomes a customer of Hope through Hope's acquisition of additional gas utilities (or their assets) and merged into Hope on and after January 1, 2023. The Legacy Surcharge shall be a rate equal to Hope's PREP rate for the customer's appropriate class.

In its base case PREP Filing, Hope projects PREP capital investment for calendar year 2025 of $65.5 million as part of its General Program (core distribution system) and Gathering Program (gathering facilities) under multi-year plans. The PREP Filing also contains a true-up for actual versus projected 2023 calendar year PREP capital investment activity for both the General Program and the Gathering Program. The PREP covers several categories of plant asset replacements and improvements, including mains, service lines, regulator stations and other plant equipment. These plant investments are proposed to be made in Hope service territories throughout the State. These projects are identified in the PREP Filing, which is on file and available for public inspection at the Commission's offices at 201 Brooks Street, Charleston, West Virginia.

In this annual PREP filing, Hope is also reconciling actual costs under Southern Public Service Company's (Southern) Infrastructure Replacement and Expansion Program as directed by the Commission in a prior order approving Hope's acquisition and merger of Southern into Hope.

Hope proposes to recover costs associated with these investments through an increment within the fixed or volumetric, base rate component of its rates depending on the applicable rate schedule under which service is rendered, to be effective on November 1, 2024. Hope projects that if the program and rate increments are approved as requested, the average monthly bill for the various classes of customers will be changed on November 1, 2024, as follows.









The increases shown are based on averages of all customers in the indicated classes. Each class may receive an increase greater or less than stated here. Individual customers may receive increases that are greater or less than average. Furthermore, the requested rates and charges are only a proposal and are subject to change (increase or decrease) by the Commission in its review of this filing. Any increase in rates and charges will not become effective until authorized and approved by the Commission.

The Commission adopted the following procedural schedule:


If the Commission receives no opposition to the PREP Filing within one week of the hearing date, the hearing may be waived, and the Commission may issue a final Order within 150 days of the filing date.

Anyone desiring to intervene should file a written petition to intervene within twenty (20) days following the date of this publication unless otherwise modified by Commission Order. All requests to intervene should briefly state the reason for the request to intervene and comply with the rules on intervention set forth in the Commission's Rules of Practice and Procedure. The Commission will receive public comments until the beginning of the hearing. All written comments and requests to intervene should state the case name and number and be addressed to Karen Buckley, Executive Secretary, P.O. Box 812, Charleston, West Virginia 25323. Public Comments may also be filed online at http://www.psc.state.wv.us/scripts/online comments/default.cfm by clicking the "Formal Case" link.

HOPE GAS, INC.

Posted 101 weeks ago
View more
Check back daily to see new goods and services, or to sell more stuff. Place Ad
  • © 2026 by Fayette Tribune
POWERED BY POWERED BY AdPerfect